Sealand DTM01C Tank Monitor Manual de usuario Pagina 5

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 48
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 4
5
1. Route 18-gauge stranded copper wire from DC Ground source to probe cap.
2. Using quick-disconnect terminals, make proper wiring connections from DC Ground source and
indicator panel to probe cap wires. Refer to wiring diagram (g. , page 4).
3. With probe cap removed from tank, turn on electrical power to system. Move black oat up and
down to assure proper operation of oat and indicator light. Red indicator light should
illuminate when oat is pushed up. After successful test, turn off electrical power and
disconnect wires at quick-connect terminals.
4. Install probe cap into 76 mm (3 in.) diameter port in top of holding tank. Tighten 1/4 turn beyond
hand tight. Re-connect wires and turn on electrical power.
6.2 Probe Cap (g. , page 2)
4
Dometic Tank Monitor Installation
Caution!
Do not use probe cap in fuel tank. Never install the probe cap with oat switch into a
tank that contains anything other than wastewater, gray water or fresh water.
Note
For installation in sailboats: Locate probe cap on athwartships centerline of tank to
assure accuracy when heeled.
6
5
Vista de pagina 4
1 2 3 4 5 6 7 8 9 10 ... 47 48

Comentarios a estos manuales

Sin comentarios